Scriver Lake
The Scriver Lake property is located in the McLennan Lake area and consists of one mineral claim covering 200 hectares of land. Previous drilling on the property has returned up to 0.108 ounces per ton of gold over 3.0 metres in hole 1 and 0.053 ounces per ton of gold over 3.5 metres in hole 2.
Bielby Lake
The Bielby Lake property is located in the Otter Lake area and consists of three mineral claims covering 745 hectares of land. Bulk till sampling and trenching has returned up to 770 ppb gold and 7.7 ppm silver from rock samples.
Jepson Lakes
The Jepson Lakes property is located in the Sulphide Lake are and consists of seven mineral claims covering 191 hectares. A sedimentary lean iron formation was traced with geophysical surveys, and drill tests have returned values of up to 0.128 ounces per ton of gold over 1.02 metres.
West Side
The West Side property consists of four mineral claims covering 605 hectares of land. Bulk till sampling has been completed, while follow-up trenching has been done in four areas. Additional sampling is planned. Previous drilling has returned up to 0.226 ounces per ton of gold over 0.5 metres in hole 2 and 0.162 ounces per ton of gold over 0.5 metres in hole 6. The property is along strike with the formerly operational Contact Lake Gold Mine which was partly owned by Cameco.
Pipestone Bay
The Pipestone Bay property consists of one mineral claim covering 240 hectares of land and is on strike with the old Anglo Rouyn copper-gold mine.


